Brays Bayou faced a significant flood risk, threatening thousands of residents and businesses. The challenge was to implement large-scale flood mitigation solutions while ensuring seamless coordination between federal and local agencies under a USACE sponsorship agreement (211f).Brays Bayou faced a significant flood risk, threatening thousands of residents and businesses. The challenge was to implement large-scale flood mitigation solutions while ensuring seamless coordination between federal and local agencies under a USACE sponsorship agreement (211f).
The solution
- $480 million project
- HCFCD’s largest flood damage reduction initiative ever
- Federal/local sponsorship agreement with the USACE (211f)
- Designed to reduce the risk of flooding and benefit thousands of residents and businesses along Brays Bayou
Methods used in Project Brays to reduce the risk of flood damage:
- Stormwater Detention Basins
- Eldridge (337 Acres)
- Old Westheimer (47 Acres)
- Arthur Storey (211 Acres)
- Willow Waterhole (292 Acres)
- Channel Modifications
- 21 miles of channel widening
- Bridge Modifications/Replacements
- 32 bridge replacements, extensions or modifications